Poor Communication Leads to Bridge Damage in Louisiana

0

Poor communication led to a tow striking a railway swing bridge near Slidell, Louisiana, the National Transportation Safety Board said Thursday.

On Jan. 12, 2021, an empty hopper barge being pushed by the towing vessel Robert Cenac struck the CSX Rigolets railway swing bridge while it was opening. The bridge sustained damage estimated at $1.1 million and the barge sustained minor damage estimated at $5,000.

No injuries or pollution were reported.

In its Marine Investigation Report 22/01, the NTSB indicated that the pilot of the Robert Cenac called the bridge operator around 10:31 p.m. to request the bridge to be opened. The bridge operator informed the pilot two trains had to pass first before he would be able to open the bridge, which normally took about 12 minutes to open fully. The Robert Cenac held about 1.5 miles from the bridge awaiting further communication from the bridge operator, while the second train cleared the bridge at 11:34 p.m.

As the captain began his approach to the bridge at 11:48 p.m. The captain told investigators that by the time he noticed the bridge was not fully open, the tow was too close to stop. Investigators determined the bridge operator did not immediately open the bridge after the second train had passed.

Investigators found neither the captain nor the bridge operator confirmed the status of the bridge opening with one another, and their accounts of communication surrounding the accident differed. But because there were no audio recordings or witnesses to the communications, investigators were not able to confirm the accuracy of the statements.

In addition, investigators found the swing span of the bridge was not fitted with any navigational lighting, as required by regulation, to indicate that it was in the open or closed position nor were navigational lights located at the end of the fenders protecting the bridge piers, also required by regulations.

The NTSB determined the probable cause of the accident was the poor communication between the bridge operator and vessel operator. Contributing to the accident was the absence of bridge span navigational lighting that would have provided the vessel operator with a visual indication of the bridge’s opening status.

“Communication between drawbridge operators and vessel operators requesting bridge openings must be clear,” the report said. “Commonly used in all modes of transportation, closed loop communication, in which the sender confirms the message is understood or provides additional information or clarification, ensures the receiver understands the message.”

Source GCaptain
Leave A Reply

Your email address will not be published.

This site uses Akismet to reduce spam. Learn how your comment data is processed.